Project Details
Embassy Suites Hotel
Description
Client:
MH Hospitality
Cost:
$20 Million
Completed:
2017
The Embassy Suites Hotel opened in 2017. Located on 2.43-acres, the project included a 7-Story Hotel Tower with first floor amenities, 2 1/2 level Parking Garage as well as additional surface parking that provide a combined 195 parking spaces. M&M’s services included a Feasibility Analysis, a rezoning, civil design, easement dedication or release, as well as additional entitlement approvals. The construction plans included a demolition plan for 12 structures, site design, grading design, utility design, paving design and drainage design. The utility plan included 412 linear feet of 12” waterline, designed along Eisenhower Street to provide water services, irrigation, and fire protection for the project.
Team Leaders:
Veronica Morgan, PE, CFM
James Batenhorst, PE
Back to Projects